彩钢瓦的安装注意事项是什么?

来源:http://www.jnqkgjg.com 日期:2019-03-05 发布人:admin

彩钢板装置办法及注意事项

Method of installing color steel plate and matters needing attention
实测装置板材的实践长度,按实测长度核对对应板号的板材长度,需求时对该板材进行取舍。
The actual length of the plate in the measuring device is checked according to the measured length, and the plate is selected or rejected when needed.
将提升到屋面的板材按排板开始线放置,并使板材的宽度覆盖标志线对准开始线。并在板长方向两头排出规划的结构长度。
The sheets lifted to the roof are laid on the starting line of the layout and the width of the sheet is covered by the marking line to align with the starting line. The planned structural length is discharged at both ends of the board length direction.
用紧固件紧固两头后,再装置   块板,其装置顺序为先自左(右)至右(左),后自下而上。
After fastening the two ends with fasteners, the plate is installed. The device sequence is from left (right) to right (left), then from bottom to top.
装置到下一放线标志点处,复查板材装置的误差,当满足规划要求后进行板材的全面紧固。不能满足要求时,应在下一标志段内调正,当在本标志段内可调正时,可调整本标志段后再全面紧固。依次全面展开装置。
Installation to the next line marking point, review the error of the plate device, when meeting the planning requirements for the overall tightening of the plate. If it fails to meet the requirements, it should be adjusted in the next marking section. When it can be adjusted in this marking section, the marking section can be adjusted and then fully tightened. Fully deploy the device in turn.
装置完后的屋面应及时检查有无遗漏紧固点。
After installation, the roof should be checked for missing fastening points in time.
在紧固自攻螺丝时应把握紧固的程度,不可过度,过度会使密封垫圈上翻,乃至将板面将压得下凹而积水。紧固不行会使密封不到位而呈现漏雨。
When tightening self-tapping screw, we should grasp the degree of tightening, not excessive, excessive will make the sealing washer upside down, and even the plate surface will be depressed and water accumulated. Failure to tighten will result in leakage of water due to inadequate sealing.
板的纵向搭接,应按规划铺设密封条和设密封胶,并在搭接处用自攻螺丝或带密封垫的拉铆钉衔接,紧固件应拉在密封条处。
In the longitudinal overlap of the plate, the sealing strip and sealant shall be laid according to the plan, and the overlap shall be joined by self-tapping screw or rivet with sealing pad. The fastener shall be pulled at the sealing strip.
压型钢板屋面围护体系的装置工序应设在工程总施工工序中合理的位置上。
The installation process of profiled steel roof enclosure system should be located in a reasonable position in the general construction process.
(1)对于纯板材构成的建筑或由板材厂家独立完结的工程项目,由承包方自主组织施工工序。
(1) The Contractor shall organize the construction process independently for the construction project consisting of pure sheet metal or the project independently completed by the sheet metal manufacturer.
(2)压型钢板屋面围护体系的施工工序宜组织在一个独立的施工段内接连完结。屋面工程的施工中,如相邻处有高出屋面的工程施工,应在相邻工程作业完结后开工,以保护屋面工程不被损坏,或不被用作脚手架的支撑面。
(2) The construction process of profiled steel roof enclosure system should be organized in an independent construction section. In the construction of roof engineering, if there is a project higher than the roof in the adjacent area, the construction should start after the completion of the adjacent project operation to protect the roof engineering from damage, or not be used as scaffolding support surface.
(3)压型钢板围护围护体系应在其支承构件的悉数工序完结后进入开工。
(3) The profiled steel sheet enclosure system shall be started after the completion of all the supporting components.
(4)墙面工程应设在其下的砌体工程和装饰工程完结的情况下开工。
(4) The wall works shall be started when the masonry works and decoration works under them have been completed.
以上信息是我们商河彩钢瓦整理发布希望对大家有所帮助我们的网站是:http://www.jnqkgjg.com
The above information is our Shanghe color steel tiles collation and publication hope to help you with our website is: http://www.jnqkgjg.com!