当前位置:首页-新闻动态 > 常见问题 >

彩钢夹芯板该怎么安装你知道吗?

来源:http://www.jnqkgjg.com 日期:2019-02-12 发布人:admin

彩钢夹芯板在装置之前应尽可能保存出厂时的包装,宜存放于室内。如堆积在室外,堆积地址应平整,不得有积水且上空不应有起重设备和重物经过,板下用垫木垫高20cm。

The color steel sandwich board should be stored as much as possible before the installation, and should be stored indoors. If stacked outdoors, the stacking address should be level, there should be no water accumulation and there should be no lifting equipment and heavy objects passing over. The height of the mattress under the board should be 20 cm.
板与板之间要放置软性资料,同型号的板放置在一起,每垛板上应有易于辨认的板型标签,并覆盖防雨油布。堆积场地应设置临时围挡,防止人员走动形成板材不必要的损坏。
Soft data should be placed between the board and the board. Place the same type of board together. Each pallet should have a plate type label that is easy to identify and covered with rain-proof tarpaulin. Temporary fencing should be installed in the stacking site to prevent unnecessary damage of sheet metal caused by the movement of personnel.
彩钢夹芯板的装置
The device of color steel sandwich panel
幕墙板的装置一般选用活动脚手架,在确保施工脚手架的承载能力时,还要考虑到:
Active scaffolding is generally used for curtain wall panel installation. In order to ensure the load-bearing capacity of construction scaffolding, consideration should also be given to:
(1)幕墙面、作业面与轴线之间的距离
(1) Distance between curtain wall, working surface and axis
(2)对照参阅面找出操控点的距离与方位,留意通视性
(2) Find out the distance and orientation of the control points and pay attention to the visibility.
(3)对照参阅面找出装置角的距离
(3) Find out the distance of the device angle by comparing the reference plane.
(4)与操控标高之间的水平差
(4) Level difference between control elevation and control elevation
(5)与建筑物竖向的距离及与各楼层的距离。
(5) The vertical distance from the building and the distance from each floor.
转移板材时应两端一起抬起,以免损坏外表氧化膜或涂层。装置墙面板时,每次只能起吊1块板,应选用厂家供给的专用夹具在墙板长度方向的拼接处2点起吊墙板。起吊过程中要缓慢进行,要用风绳加以操控,防止与已装置的墙板磕碰,脚手架杰出部位用软性资料包裹。
When transferring the sheet, both ends should be raised together to avoid damage to the oxide film or coating on the surface. When installing wall panels, only one board can be lifted at a time. The special fixture provided by the manufacturer should be used to lift the wall panels at two points at the joint of the wall panels in the length direction. The lifting process should be carried out slowly and controlled by wind rope to prevent collision with the wall panels installed, and the outstanding parts of scaffolding should be wrapped with soft data.
夹芯板的固定主要有2种方法:一种是自攻螺钉穿过墙板直接固定在墙面次结构上。另一种方法是自攻螺钉经过衔接件直接与墙面次结构衔接。
There are two main ways to fix sandwich panels: one is to fix the self-tapping screw through the wall panels directly on the secondary structure of the wall. Another method is that the self-tapping screw connects directly with the wall sub-structure through the connector.
幕墙板装置精度:立面垂直度2mm,外表平整度3mm,接缝平直度0.5mm.装置时应按厂方供给的技能手册严格执行。
Accuracy of curtain wall panel device: vertical 2mm, surface smoothness 3mm, joint smoothness 0.5mm. The device should be strictly implemented according to the technical manual supplied by the factory.
以上信息是我们商河彩钢瓦整理发布希望对大家有所帮助我们的网站是:http://www.jnqkgjg.com !
The above information is our Shanghe color steel tile collation and publication hope to help you all on our website is: http://www.jnqkgjg.com!